Site Meter
Send Us An Email
Panama Guide

Welcome to Panama Guide
Friday, March 22 2019 @ 08:06 PM UTC

Panama Canal awards third dry excavation contract

Canal ExpansionThe JOURNAL of COMMERCE ONLINE - The Panama Canal Authority has awarded the third of four dry excavation contracts to Constructora MECO, to help create an access channel linking the new Pacific locks with the waterway's existing Gaillard Cut, which is the narrowest stretch of the Panama Canal. The authority selected Constructora MECO from among six bids, and said that the Costa Rican firm was the lowest bidder. The scope of work included in the contract encompasses the excavation, removal and disposal of 8 million cubic meters of material, which will further reduce Paraiso (Paradise) Hill from 46 meters to 27.5 meters above sea level. It also calls for the construction of approximately 2.5 kilometers of access roads and the clearing of 190 hectares of land bearing munitions and explosives, remnants from former U.S. military training in Panama.

Editor's Comment: I'm sure they'll do a bang-up job. But seriously, folks - that's a dangerous undertaking and I hope they have (or hire) the technical expertise to clear the firing ranges safely. And the fact that the ACP is clearing these lands as part of the expansion project is also sound thinking - good for them.

Share
  • Facebook
  • Google Bookmarks

Story Options

Panama Canal awards third dry excavation contract | 0 comments | Create New Account
The following comments are owned by whomever posted them. This site is not responsible for what they say.