Site Meter
Send Us An Email
Panama Guide

Welcome to Panama Guide
Thursday, April 24 2014 @ 04:41 PM EDT

Movement Of Heavy Equipment Starting For Canal Expansion Project

Canal ExpansionStarting now and until Saturday 10 March 2012, and during the schedule of Monday through Sunday from 8:00 am until 7:00 pm, the Consorcio Borinquen, a subcontractor for the Consorcio Grupo Unidos por el Canal S.A. (GUPCSA), will be moving loads of over-sized and heavy equipment, including hydraulic excavators, using both articulated and fixed trucks, from the Port of Manzanillo, passing through the highway that links Panama City to Colon. The trucks will then follow the Northern Corridor, down the Centennial Way, cross the Centennial Bridge, then the Borinquen Highway to the project area in CocolÝ. The shipments will be made with escort vehicles, and with the corresponding permits from the Land Transit and Transportation Authority (ATTT). This equipment will be used as part of the work for the design and construction of the Third Set of Locks in the Pacific Sector. (Panama America)

Share
  • Facebook
  • Google Bookmarks

Story Options

Movement Of Heavy Equipment Starting For Canal Expansion Project | 1 comments | Create New Account
The following comments are owned by whomever posted them. This site is not responsible for what they say.
Movement Of Heavy Equipment Starting For Canal Expansion Project
Authored by: Anonymous on Thursday, February 23 2012 @ 06:59 AM EST

What 3rd set of locks????