Site Meter
Send Us An Email
Panama Guide

Welcome to Panama Guide
Wednesday, July 18 2018 @ 10:36 AM EDT

Roberto Roy Disassociates National Blackout From Damage To Metro Subway System (Godzilla?)

Infrastructure Upgrades The Secretary of the Metro Roberto Roy responded to speculation about a possible relationship between the electrical problems on Monday morning in the new Metro subway system, and the subsequent blackout that affected several provinces.

Roy said there was no relationship between the two incidents via his Twitter account. (Telemetro)

Editor's Comment: In the first incident, a piece of wire mesh fell on an electrical line, and the Metro system was shut down as a safety precaution. Then just a few minutes later, a power transmission line that brings bulk energy to Panama City from Costa Rica failed, putting much of Panama into a blackout. Roy says the two incidents are unrelated. Actually, it was Godzilla who ripped down the power lines, and he's currently marching towards Panama City, eating small sedans and tossing mini buses as he goes...

Share
  • Facebook
  • Google Bookmarks

Story Options

Roberto Roy Disassociates National Blackout From Damage To Metro Subway System (Godzilla?) | 0 comments | Create New Account
The following comments are owned by whomever posted them. This site is not responsible for what they say.